Jump to content
Sign in to follow this  
Moderator_02

Fourth set of locks depends on water supply

Recommended Posts

Quote

Fourth set of locks depends on water supply

locks.jpg
Post Views: 115
 
“The construction of the fourth set of locks for the Panama Canal will largely depend on water supply, and if that problem is not solved we can forget about it although the demand is there says Canal Administrator Jorge Luis Quijano.

In   an interview with the EFE News agency he said  the construction of a fourth set of locks by 2025 had been considered  and in September 2016  he had announced the constitution of a team to study the matter, which was  conditioned  by the “demand” of the market, but already  the China Harbor Engineering Company (CHEC) had expressed interest in the work .

The third set of locks “reflects a ship size focused on the container carrier and coincidentally there are those of liquefied natural gas, that is, the ability to adapt to our infrastructure and the business models are those that have given us the ability to move in a business that is very rigid. ”

“Our infrastructure is not a thing that is built from one day to the next, it took us 9 years to expand, it’s not the same as every three, four months, you make a  new chi. to build a new lock it’s going to take another 8 years, “he said
 

https://www.newsroompanama.com/business/panama-4/fourth-set-of-locks-depends-on-water-supply

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...